Yesterday was the culmination of a busy week of preparation. Being a bit of a perfectionist, I often tend to procrastinate but then find myself feeling frustrated that I haven’t achieved as much as I’d like to. Time to knuckle down and get things moving. There are lots of things I want to do in my woods but not enough man-hours so I try to prioritise jobs so that my time there is used most effectively. We are having a log burning stove fitted this week, so bringing logs back is high on the list. But what to do with them when I get them back is another problem. So I ordered a log store for the back yard. That arrived (flat packed) on Tuesday so a couple of hours spent putting it together and levelling it up was the first job. Then putting my few logs in it. A satisfying feeling, like a food in the fridge.

My newly erected and partly stocked log store.
There’s nowhere for anyone to sit if they visit the woods, and nowhere to put my gear, other than on the ground. So I decided it’s time to get a few home comforts in there. While waiting for delivery of the log store, I was busy varnishing an old builders plank that I thought would make a simple and easy bench. I also figured, if I could get some free wooden pallets from somewhere, I could make a rough and ready log store down at the woods for the surplus logs to start seasoning. A few calls here and there and I located about eight of them. One has the slats placed very close together and looked like a table top. So next job, using some scrap wood I have been storing for about 15 years, I made some legs for it.
Time also to get some power tools to help the jobs along, namely sawing up lots of logs from the deadwood and clearing the masses of brambles. That’s an area I have procrastinated about, so some internet research done and a Husqvarna chainsaw and brush-cutter are now on order. And talking about sawing logs, there will be a lot of thin and sickly trees to fell but there’s a TPO on the wood (Tree Preservation Order) which means I need permission before cutting any. The best way is to apply to the Forestry Commission for a thinning licence. To prepare my application has taken a lot of time and study. They need estimates of the total number of trees, the species and ages of them, and the hardest part – the estimated volume of timber. I pushed myself this week to get that finished and sent off. It’s done, just a waiting game now till they authorise it. Finally, I needed some concrete blocks to act as legs to stand my plank-bench on, so a trip to the builders’ yard for those.
So to top the week off, car loaded to the hilt, I visited the wood yesterday to take my new bench and table and set it all up and bring back some more logs for the log store. It was a very dull and dreary day weather-wise, so the wood had a very sombre feel about it. Signs of autumn are taking effect and a feeling of winding down now was very much evident. First job, put the plank and blocks in place to make my bench. For now, I decided to place it where I have my base for resting and brewing coffee. Next job, assemble the table and give it a coat of preserver. That went in the same area, so now I have a picnic area set-up and somewhere to put my bits and pieces when working. I placed another pallet underneath and loaded it up with some small dead sticks to keep them dry ready for campfires. A large sycamore is lying dead on the ground, so I started hand sawing logs of it to bring home. Hard work – can’t wait to get the chainsaw. All in all, a very productive and satisfying week.

My new base-camp, bench and table.